Case study – Dewatering Screw press EQUIP SLUDGE 1200 – Yellowstone, USA

Sludge treatment project

The client initially used containers and big bags to dewater the sludge produced at the new plant. They have now decided to install a screw press to process all the sludge once a week. This upgrade will save time for the operators and reduce the sludge evacuation costs for the facility.

“ We work on sludge only once a week ”

Project

  • Technology : Screw press
  • Capacity : 18 m³/h | 80 GPM
  • Inlet sludge dryness : 2%
  • Outlet dryness required : 16%
  • Required work time : 5 hours, 1 day per week

Benefits:

→ Treats all weekly sludge in one day

→ Sludge distribution with two gate valves

→ Fully enclosed unit

→ Low maintenance requirements

Video


Full case study


download PDF